0 Replies Latest reply on May 30, 2008 5:33 PM by Joel_Pointon

    Harness Release to generate ALL reports

    Joel_Pointon

      When a harness drawing is completed and released, all of the reports then have to be manually generated - it would be useful and save a lot of time if all the reports could be generated when the Drawing Release feature is used.